PROJECT DETAILS

Chambersburg First Church of God

nivo slider image nivo slider image

"You have been a tremendous help during each step of the way. The design has been exceptional and everyone that goes through our building comments on the great functionality….. Your integrity and professionalism working with us has been very evident, and you mixed a strong sense of friendliness that made it a great pleasure to work with you. We certainly recommend your work to anyone."

Earl E. Mills, Lead Pastor

SUMMARY:
This exciting project represented a total relocation for the Chambersburg (Pa) First Church of God to their newly acquired 24-acre site on the growing North end of town. The 50,000 square foot facility was designed to enable the church to build in two equally sized phases; however they were able to construct the entire facility in one combined project. The new facility, equipped with digital audio, video, and performance lighting has enabled the church to provide multiple Sunday morning services in both the auditorium and gymnasium, which has resulted in substantial growth.

QUICK STATS:
• Project Type: New Construction
• Services Provided: Architectural & Administration
• Sq Ft: 50,000
• Project Status: Completed

BUILDING FEATURES:
• 100’ wide, 550-seat sanctuary with 150-seat balcony
• 150 seat internal expansion capability
• Spacious lobby and hospitality area
• Full-size gymnasium and stage
• Library
• Christian education
• Children and Youth Worship areas
• Administration wing
• Drive-thru canopy
• Wrap-around parking design for over 200 cars
• Master plan for expansion of indoor and outdoor elements

NOTE:
Centura has a long-standing relationship with this congregation, dating back to 1981, when the church was victimized by an arsonist and the entire Christian Education wing at their previous location was destroyed. Centura was selected to head-up that reconstruction process and has been entrusted with all their campus development ever since.